СШАПохоже на то, что Вы находитесь сейчас в США.
Подтвердить
Выбрать другую страну

Instructions for use

1
...
8
9
10
...
12

POWER GLAZE (optional)

Note:

  • Once the restoration has been finished and fitted, Power Glaze firing can be carried out. Recommended for bridge constructions.
  • This is performed for every restoration, regardless of whether it is then polished, stained or veneered.
    It is carried out with the VITA AKZENT Plus GLAZE LT glaze material and causes superficial smoothing of the processed restoration, as well as contributing to an increase in strength.

Please note:

  • After Power Glaze firing, the restoration must not be sandblasted again, as this will reduce the strength again.
  • During long-term cooling, the lift position should be at 75 %.

Note:

  • For more information on the firing parameters, please refer to the chapter Shade reproduction/Firing under item 7.4 in these Instructions for use.
ru Pусский